IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
Reset
NAICS 33699 Other Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0263 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,566 $6,725 Not Implemented
TT0263 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $4,140 $5,000 Not Implemented
TT0263 # 04 Y:2021 04 2021 ADOPT IN-HOUSE MATERIAL GENERATION $9,686 $17,700 Not Implemented
TT0263 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $45,807 $72,000 Not Implemented
TT0263 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,663 $88,815 Implemented
UD1021 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $16,106 $2,800 Implemented
UD1021 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,419 $37,053 Implemented
UD1021 # 07 Y:2020 07 2020 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,594 $1,590 Not Implemented
UD1021 # 11 Y:2020 11 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $249 $240 Not Implemented
UD1021 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,902 $7,800 Not Implemented
UD1021 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,283 $0 Implemented
UD1021 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,841 $0 Implemented
UD1021 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,342 $0 Implemented
UD1021 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,965 $1,400 Not Implemented
UD1021 # 06 Y:2020 06 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,902 $2,000 Implemented
UD1021 # 02 Y:2020 02 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $32,724 $0 Implemented
NC0622 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $481 $250 Implemented
NC0622 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $161 $450 Not Implemented
NC0622 # 09 Y:2018 09 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,903 $500 Implemented
NC0622 # 06 Y:2018 06 2018 RECOVER WASTE HEAT FROM EQUIPMENT $4,913 $8,000 Not Implemented
NC0622 # 07 Y:2018 07 2018 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,221 $1,000 Not Implemented
NC0622 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,812 $46,617 Implemented
NC0622 # 08 Y:2018 08 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,727 $28,500 Not Implemented
NC0622 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,361 $6,000 Not Implemented
NC0622 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,414 $525 Implemented