IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 336992 Military Armored Vehicle, Tank, and Tank Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0519 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $967 $0 Not Implemented
SU0519 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $384 $25 Not Implemented
SU0519 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,384 $285 Not Implemented
SU0519 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $294 Not Implemented
SU0519 # 06 Y:2022 06 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,357 $675 Not Implemented
SU0519 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,214 $498 Not Implemented
SU0519 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $244 $479 Not Implemented
SU0519 # 09 Y:2022 09 2022 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $312 $1,100 Not Implemented
SU0519 # 10 Y:2022 10 2022 INSTALL OCCUPANCY SENSORS $149 $746 Not Implemented
SU0519 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,052 $0 Not Implemented
UD0929 # 05 Y:2015 05 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,522 $12,800 Implemented
UD0929 # 01 Y:2015 01 2015 BURN A LESS EXPENSIVE GRADE OF FUEL $424,424 $0 Implemented
UD0929 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $90,554 $10,250 Not Implemented
UD0929 # 03 Y:2015 03 2015 INSTALL SET-BACK TIMERS $225,530 $1,200 Not Implemented
UD0929 # 04 Y:2015 04 2015 REDUCE EXCESSIVE BOILER BLOWDOWN $61,951 $15,000 Not Implemented
UD0929 # 06 Y:2015 06 2015 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $658,499 $100,000 Implemented
UD0929 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $290,782 $0 Not Implemented
UD0890 # 02 Y:2013 02 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,847 $0 Not Implemented
UD0890 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $19,159 $0 Not Implemented
UD0890 # 11 Y:2013 11 2013 USE RADIANT HEATER FOR SPOT HEATING $565,879 $1,157,500 Not Implemented
UD0890 # 10 Y:2013 10 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $746,973 $100,000 Not Implemented
UD0890 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $176,886 $101,000 Not Implemented
UD0890 # 08 Y:2013 08 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,203 $0 Implemented
UD0890 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $37,438 $6,000 Implemented
UD0890 # 06 Y:2013 06 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,216 $0 Implemented