IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
NAICS 336992 Military Armored Vehicle, Tank, and Tank Component Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0448 # 06 Y:2025 06 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $8,205 $72,000 n/a
MS0448 # 05 Y:2025 05 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $24,271 $200,000 n/a
MS0448 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,225 $34,284 n/a
MS0448 # 03 Y:2025 03 2025 INSTALL REPLACEMENT DOORS $10,741 $15,697 n/a
MS0448 # 02 Y:2025 02 2025 AIR CONDITION ONLY SPACE NECESSARY $48,357 $35,751 n/a
MS0448 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $217,439 $973,557 n/a
LE0598 # 02 Y:2025 02 2025 INSTALL OCCUPANCY SENSORS $37,915 $27,000 n/a
LE0598 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,559 $6,000 n/a
LE0598 # 03 Y:2025 03 2025 CONVERT TO ROBOTIC PAINTING $218,856 $362,095 n/a
LE0598 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $302,215 $689,368 n/a
LE0598 # 05 Y:2025 05 2025 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $456,991 $909,175 n/a
LE0598 # 06 Y:2025 06 2025 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $11,873 $25,113 n/a
LE0598 # 07 Y:2025 07 2025 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $2,194,349 $9,580,000 n/a
MS0428 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $647 $0 n/a
MS0429 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,143 $0 n/a
MS0429 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $5,847 $35,728 n/a
MS0429 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,731 $8,233 n/a
MS0428 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $788 $1,677 n/a
MS0428 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $11,631 $131,059 n/a
SU0519 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,052 $0 Not Implemented
SU0519 # 02 Y:2022 02 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $967 $0 Not Implemented
SU0519 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $384 $25 Not Implemented
SU0519 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,384 $285 Not Implemented
SU0519 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,650 $294 Not Implemented
SU0519 # 06 Y:2022 06 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,357 $675 Not Implemented