Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 337 | Furniture and Related Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0559 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,076 | $359,360 | Not Implemented |
UF0559 # 05 Y:2020 | 05 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,600 | $3,317 | Implemented |
UF0559 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $602 | $0 | Implemented |
UF0559 # 08 Y:2020 | 08 | 2020 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,262 | $7,180 | Implemented |
UF0559 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,328 | $5,468 | Implemented |
UF0559 # 02 Y:2020 | 02 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $19,566 | $32,210 | Implemented |
UF0559 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,767 | $956 | Implemented |
UF0559 # 04 Y:2020 | 04 | 2020 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $3,003 | $750 | Implemented |
MI0372 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,658 | $2,091 | Not Implemented |
MI0372 # 06 Y:2020 | 06 | 2020 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,113 | $2,041 | Not Implemented |
MI0372 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,674 | $120 | Implemented |
MI0372 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,282 | $1,980 | Implemented |
MI0372 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,241 | $20,434 | Not Implemented |
MI0372 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,103 | $21,302 | Implemented |
MI0370 # 07 Y:2020 | 07 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,066 | $480 | Implemented |
MI0370 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $7,381 | $10,120 | Not Implemented |
MI0370 # 05 Y:2020 | 05 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,983 | $580 | Implemented |
MI0370 # 02 Y:2020 | 02 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,944 | $53,621 | Not Implemented |
MI0370 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,446 | $2,260 | Not Implemented |
MI0370 # 08 Y:2020 | 08 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,834 | $1,980 | Implemented |
MI0370 # 09 Y:2020 | 09 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,780 | $580 | Implemented |
MI0370 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,663 | $120 | Implemented |
MI0370 # 01 Y:2020 | 01 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $15,466 | $26,940 | Not Implemented |
MI0370 # 10 Y:2020 | 10 | 2020 | INSTALL OCCUPANCY SENSORS | $1,149 | $500 | Not Implemented |
MI0370 # 11 Y:2020 | 11 | 2020 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $796 | $134 | Not Implemented |