Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
92
matching recommendationsNAICS | 337 | Furniture and Related Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0500 # 07 Y:2013 | 07 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $577 | $875 | Implemented |
NC0500 # 02 Y:2013 | 02 | 2013 | MAKE A NEW BY-PRODUCT | $86,815 | $250,000 | Implemented |
NC0500 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,558 | $100 | Implemented |
NC0500 # 09 Y:2013 | 09 | 2013 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $286 | $750 | Not Implemented |
NC0500 # 12 Y:2013 | 12 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,622 | $775 | Implemented |
NC0500 # 10 Y:2013 | 10 | 2013 | METER WASTE WATER | $4,155 | $4,200 | Implemented |
NC0500 # 06 Y:2013 | 06 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,293 | $125 | Implemented |
NC0500 # 03 Y:2013 | 03 | 2013 | AIR CONDITION ONLY SPACE NECESSARY | $4,146 | $200 | Implemented |
NC0500 # 08 Y:2013 | 08 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,389 | $7,000 | Implemented |
NC0500 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $2,704 | Not Implemented |
NC0500 # 01 Y:2013 | 01 | 2013 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $59,689 | $250,000 | Not Implemented |
NC0500 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $596 | $1,565 | Not Implemented |
NC0500 # 04 Y:2013 | 04 | 2013 | REDUCE FLUID FLOW RATES | $34,287 | $18,000 | Implemented |
NC0496 # 02 Y:2013 | 02 | 2013 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $21,698 | $75,000 | Not Implemented |
NC0496 # 04 Y:2013 | 04 | 2013 | REDUCE FLUID FLOW RATES | $698 | $3,000 | Implemented |
NC0496 # 05 Y:2013 | 05 | 2013 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $1,899 | $7,281 | Not Implemented |
NC0496 # 08 Y:2013 | 08 | 2013 | USE PHOTOCELL CONTROLS | $575 | $200 | Implemented |
NC0496 # 09 Y:2013 | 09 | 2013 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $65,547 | $10,000 | Implemented |
NC0496 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,131 | $100 | Implemented |
NC0496 # 03 Y:2013 | 03 | 2013 | CLOSE OFF UNNEEDED STEAM LINES | $638 | $0 | Implemented |
NC0496 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $1,315 | $3,203 | Implemented |
NC0496 # 10 Y:2013 | 10 | 2013 | CONDENSE OPERATION INTO ONE BUILDING | $37,518 | $5,000 | Implemented |
NC0496 # 01 Y:2013 | 01 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,814 | $0 | Implemented |
NC0498 # 06 Y:2013 | 06 | 2013 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $233 | $200 | Not Implemented |
NC0498 # 07 Y:2013 | 07 | 2013 | REDUCE FLUID FLOW RATES | $5,702 | $10,000 | Not Implemented |