IAC Assessment: NC0498
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0498
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Casegood and upholstered furniture
NAICS 337121 - Upholstered Household Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $50,000,000-$100,000,000
# of Employees 615
Plant Area (Sq.Ft.) 500,000
Annual Production 35,000 Pieces
Production Hrs. Annual 2,610
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $409,823 6,610,805 kWh $0.06
Electricity Demand $136,747 32,625 kW-months/year $4.19
Electricity Fees $(-41,731) - $ -
Natural Gas $3,167 278 MMBtu $11.39
Fuel Oil #6 $62,412 3,017 MMBtu $20.69
Wood $1 22,890 MMBtu $0.00
TOTAL ENERGY COSTS $570,419
RECOMMENDED SAVINGS* $103,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,992
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,018
Cost:
$41,400
$15,267 246,645 $4,751 1,134 - - - - - - - - - - $15,267
246,645
kWh
$4,751
1,134
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,186
Cost:
$1,950
- - - - - - $12,186 589 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,186
589
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$408
Cost:
$100
$723 11,682 $225 54 - - - - - - $(-300) - $(-240) - $723
11,682
kWh
$225
54
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$(-300)
-
$
$(-240)
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,327
Cost:
$3,547
$2,327 37,538 - - - - - - - - - - - - $2,327
37,538
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$102
Cost:
$80
$102 1,650 - - - - - - - - - - - - $102
1,650
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$233
Cost:
$200
$177 2,871 $56 13 - - - - - - - - - - $177
2,871
kWh
$56
13
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
07: 2.5123 REDUCE FLUID FLOW RATES Savings:
$5,702
Cost:
$10,000
$4,339 70,094 $1,363 325 - - - - - - - - - - $4,339
70,094
kWh
$1,363
325
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
08: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$402
Cost:
$1,500
- - - - - - $402 19 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$402
19
MMBtu
-
-
Tgal
-
-
$
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,666
Cost:
$1,200
- - - - - - $1,666 81 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,666
81
MMBtu
-
-
Tgal
-
-
$
-
-
$
10: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$9,172
Cost:
$6,200
- - - - - - $13,397 648 - - $(-625) - $(-3,600) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,397
648
MMBtu
-
-
Tgal
$(-625)
-
$
$(-3,600)
-
$
11: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$37,017
Cost:
$50,000
- - - - $(-25,395) (-2,893) $62,412 3,017 - - - - - - -
-
kWh
-
-
kW-months/year
$(-25,395)
(-2,893)
MMBtu
$62,412
3,017
MMBtu
-
-
Tgal
-
-
$
-
-
$
12: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,038
Cost:
$1,000
- - - - - - $280 14 $758 971,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$280
14
MMBtu
$758
971,500
Tgal
-
-
$
-
-
$
13: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,038
Cost:
$1,000
- - - - - - $280 14 $758 971,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$280
14
MMBtu
$758
971,500
Tgal
-
-
$
-
-
$
14: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$12,483
Cost:
$61,250
- - - - - - $12,483 603 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,483
603
MMBtu
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$103,792
Cost:
$179,427
$22,935 370,480 $6,395 1,526 $(-25,395) (-2,893) $103,106 4,985 $1,516 1,943,000 $(-925) - $(-3,840) - $22,935
370,480
kWh
$6,395
1,526
kW-months/year
$(-25,395)
(-2,893)
MMBtu
$103,106
4,985
MMBtu
$1,516
1,943,000
Tgal
$(-925)
-
$
$(-3,840)
-
$
TOTAL IMPLEMENTED Savings:
$50,992
Cost:
$62,547
$3,050 49,220 $225 54 $(-25,395) (-2,893) $77,877 3,765 - - $(-925) - $(-3,840) - $3,050
49,220
kWh
$225
54
kW-months/year
$(-25,395)
(-2,893)
MMBtu
$77,877
3,765
MMBtu
-
-
Tgal
$(-925)
-
$
$(-3,840)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Water Disposal Personnel Changes Ancillary Material Cost