IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

136

matching recommendations
Reset
NAICS 337 Furniture and Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0759 # 07 Y:2007 07 2007 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $534 $0 Not Implemented
UD0759 # 08 Y:2007 08 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $266 $0 Not Implemented
UD0759 # 09 Y:2007 09 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $173 $0 Not Implemented
MA0615 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,604 $84,300 Implemented
MA0615 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,050 $100,800 Not Implemented
MA0615 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,125 $0 Implemented
MA0615 # 04 Y:2007 04 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,561 $53,848 Not Implemented
MA0615 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,214 $800 Implemented
MA0615 # 06 Y:2007 06 2007 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $10,518 $13,000 Implemented
MA0615 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $8,155 $0 Implemented
MA0615 # 08 Y:2007 08 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,499 $15,500 Not Implemented
MA0615 # 09 Y:2007 09 2007 OPTIMIZE PLANT POWER FACTOR $4,673 $18,500 Implemented
MA0615 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,121 $3,200 Implemented
MS0311 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,634 $62,998 Not Implemented
MS0311 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,986 $23,207 Not Implemented
MS0311 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,166 $176 Implemented
MS0311 # 04 Y:2007 04 2007 SHUT OFF PILOTS IN STANDBY EQUIPMENT $1,669 $185 Not Implemented
MS0311 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,304 $2,700 Implemented
MS0311 # 06 Y:2007 06 2007 BURN WASTE OIL FOR HEAT $1,265 $2,186 Not Implemented
MS0311 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $385 $476 Not Implemented
LE0248 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $21,600 $15,000 Not Implemented
LE0248 # 02 Y:2007 02 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,118 $1,600 Not Implemented
LE0248 # 03 Y:2007 03 2007 INSTALL TIMERS AND/OR THERMOSTATS $5,402 $2,000 Not Implemented
LE0248 # 04 Y:2007 04 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,065 $11,000 Implemented
LE0248 # 05 Y:2007 05 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,500 $2,500 Implemented