IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 337 Furniture and Related Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0054 # 15 Y:2010 15 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,900 $36,600 Not Implemented
DL0054 # 16 Y:2010 16 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $950 $900 Implemented
DL0054 # 06 Y:2010 06 2010 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $11,071 $19,300 Not Implemented
DL0054 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,300 $8,000 Implemented
DL0054 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $9,200 $1,000 Not Implemented
DL0054 # 03 Y:2010 03 2010 USE OPTIMUM TEMPERATURE $20,574 $1 Not Implemented
DL0054 # 02 Y:2010 02 2010 INSULATE BARE EQUIPMENT $14,240 $2,378 Not Implemented
NC0403 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,060 $2,000 Not Implemented
NC0403 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,190 $1,500 Implemented
NC0403 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $400 Implemented
NC0403 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,409 $0 Not Implemented
NC0403 # 01 Y:2010 01 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $1,310,487 $0 Not Implemented
LE0295 # 01 Y:2010 01 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $390,835 $2,640,000 Not Implemented
LE0295 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,285 $50,000 Not Implemented
LE0295 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,204 $35,000 Not Implemented
LE0295 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,686 $1,840 Implemented
LE0295 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,513 $1,000 Implemented
LE0295 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,215 $58,964 Implemented
LE0295 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,099 $104 Not Implemented
UA0045 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,605 $5,500 Implemented
UA0045 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $27,056 $4,100 Not Implemented
UA0045 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,672 $740 Not Implemented
UA0045 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,323 $0 Implemented
UA0045 # 03 Y:2010 03 2010 USE RADIANT HEATER FOR SPOT HEATING $53,011 $50,388 Not Implemented
UA0045 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $1,354 $253 Implemented