IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0212 # 05 Y:2023 05 2023 USE OPTIMUM THICKNESS INSULATION $4,220 $4,402 Not Implemented
UU0212 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Not Implemented
UU0212 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,326 $21,555 Not Implemented
UU0212 # 02 Y:2023 02 2023 REPLACE BOILER $11,580 $80,000 Not Implemented
UU0212 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,149 $8,500 Not Implemented
UU0212 # 06 Y:2023 06 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $425 $850 Not Implemented
UU0212 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $382 $1,370 Not Implemented
UU0213 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,602 $1,773 Not Implemented
UU0213 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $639 $1,950 Not Implemented
UU0213 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,190 $3,000 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
UU0213 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $5,181 $18,250 Not Implemented
UU0105 # 02 Y:2006 02 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,370 $0 Not Implemented
UU0105 # 08 Y:2006 08 2006 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $15,140 $40,000 Not Implemented
UU0105 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,980 $4,365 Not Implemented
UU0105 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $3,000 $2,300 Not Implemented
UU0105 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $440 $170 Not Implemented
UU0105 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,620 $430 Not Implemented
UU0105 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,340 $3,385 Not Implemented
UU0105 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $6,120 $8,220 Not Implemented
UU0085 # 06 Y:2005 06 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $390 $1,300 Not Implemented
UU0085 # 07 Y:2005 07 2005 INSULATE FEEDWATER TANK $150 $200 Not Implemented
UU0085 # 05 Y:2005 05 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,300 $940 Not Implemented
UU0085 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,090 $21,620 Not Implemented
UU0085 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,110 $405 Not Implemented