IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0089 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $368 $150 Not Implemented
LM0089 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,655 $4,550 Not Implemented
LM0089 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $380 Implemented
SF0291 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,113 $720 Implemented
SF0291 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,433 $0 Not Implemented
SF0291 # 03 Y:2004 03 2004 ADD AREA LIGHTING SWITCHES $9,569 $1,464 Implemented
SF0291 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,135 $222 Not Implemented
SF0291 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,810 $5,675 Implemented
SF0291 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,732 $78,810 Implemented
SF0291 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,676 $22,891 Not Implemented
SF0291 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $914 $3,294 Implemented
SF0291 # 09 Y:2004 09 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,955 $102,295 Not Implemented
LM0073 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,649 $0 Implemented
LM0073 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,682 $1,300 Implemented
LM0073 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,911 $3,520 Not Implemented
LM0073 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,384 $0 Not Implemented
LM0073 # 04 Y:2004 04 2004 ADD AREA LIGHTING SWITCHES $6,155 $1,600 Not Implemented
LM0073 # 05 Y:2004 05 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $784 $0 Implemented
LM0073 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,570 $1,093 Implemented
LM0073 # 12 Y:2004 12 2004 DEVELOP STANDARD OPERATING PROCEDURES $33,857 $9,860 Not Implemented
LM0073 # 11 Y:2004 11 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $10,400 $1,562 Implemented
LM0073 # 10 Y:2004 10 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $207,176 $0 Not Implemented
LM0073 # 09 Y:2004 09 2004 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $27,520 $4,000 Implemented
LM0073 # 08 Y:2004 08 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,302 $10,000 Not Implemented