IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0441 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $782 $300 Not Implemented
NC0441 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $9,319 $1,000 Not Implemented
NC0441 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $4,151 $1,000 Not Implemented
NC0441 # 07 Y:2012 07 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $350 $800 Implemented
NC0441 # 08 Y:2012 08 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $462 $600 Implemented
NC0441 # 09 Y:2012 09 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,800 $1,000 Not Implemented
NC0441 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $1,119 $1,000 Implemented
NC0441 # 11 Y:2012 11 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,596 $4,760 Implemented
NC0441 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $551 $7,310 Implemented
NC0441 # 13 Y:2012 13 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $5,880 Implemented
NC0441 # 14 Y:2012 14 2012 DEVELOP A REPAIR/REPLACE POLICY $500 $1,980 Implemented
NC0441 # 15 Y:2012 15 2012 USE HEAT PUMP FOR SPACE CONDITIONING $1,795 $10,400 Not Implemented
NC0368 # 01 Y:2007 01 2007 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $42,586 $100,000 Not Implemented
NC0368 # 02 Y:2007 02 2007 DEVELOP A REPAIR/REPLACE POLICY $640 $1,297 Implemented
NC0368 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,202 $7,000 Not Implemented
NC0368 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,775 $5,800 Not Implemented
NC0368 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,986 $100 Implemented
NC0368 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $267 $960 Implemented
NC0368 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,394 $3,917 Not Implemented
NC0368 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,919 $50 Implemented
NC0326 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,944 $2,000 Not Implemented
NC0326 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,606 $5,000 Implemented
NC0326 # 03 Y:2005 03 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $6,834 $10,100 Not Implemented
NC0326 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,368 $0 Implemented
NC0326 # 05 Y:2005 05 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,139 $900 Implemented