IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3371 Household and Institutional Furniture and Kitchen Cabinet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0546 # 12 Y:2015 12 2015 DEVELOP A REPAIR/REPLACE POLICY $1,078 $3,411 Implemented
NC0546 # 11 Y:2015 11 2015 REPAIR AND ELIMINATE STEAM LEAKS $311 $200 Implemented
NC0546 # 10 Y:2015 10 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33 $150 Implemented
NC0546 # 09 Y:2015 09 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,071 $4,500 Not Implemented
NC0546 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,094 $1,000 Not Implemented
NC0546 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $100 Implemented
NC0546 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,643 $25,887 Implemented
NC0546 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $1,207 $944 Not Implemented
NC0546 # 03 Y:2015 03 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $823 $182 Implemented
NC0546 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $48 Implemented
NC0546 # 05 Y:2015 05 2015 USE PHOTOCELL CONTROLS $4,235 $600 Not Implemented
NC0546 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $692 $503 Implemented
NC0415 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $937 $50 Not Implemented
NC0415 # 07 Y:2010 07 2010 $8,000 $15,750 Implemented
NC0415 # 06 Y:2010 06 2010 $12,000 $1,000 Implemented
NC0415 # 05 Y:2010 05 2010 DEVELOP A REPAIR/REPLACE POLICY $911 $1,846 Implemented
NC0415 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $50 Implemented
NC0415 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,465 $500 Not Implemented
NC0415 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,456 $3,200 Implemented
NC0403 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $400 Implemented
NC0403 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $6,060 $2,000 Not Implemented
NC0403 # 02 Y:2010 02 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,409 $0 Not Implemented
NC0403 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,190 $1,500 Implemented
NC0403 # 01 Y:2010 01 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $1,310,487 $0 Not Implemented
NC0367 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,742 $6,500 Not Implemented