IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 33712 Household and Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0201 # 02 Y:2016 02 2016 ELIMINATE/REDUCE AN OPERATION $8,491 $0 Not Implemented
MZ0201 # 03 Y:2016 03 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $19,426 $0 Not Implemented
MZ0201 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,717 $0 Not Implemented
MZ0201 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,192 $12,000 Not Implemented
MZ0201 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,397 $1,500 Not Implemented
MZ0201 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,703 $930 Not Implemented
MZ0201 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,907 $136,500 Implemented
MZ0201 # 09 Y:2016 09 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Not Implemented
MZ0201 # 01 Y:2016 01 2016 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $108,895 $375,000 Not Implemented
BD0285 # 10 Y:2005 10 2005 CHANGE OPERATING CONDITIONS $2,898 $2,500 Not Implemented
BD0285 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $3,135 $1,320 Not Implemented
BD0285 # 08 Y:2005 08 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $11,600 $480 Implemented
BD0285 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $360 Implemented
BD0285 # 06 Y:2005 06 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $488 $0 Implemented
BD0285 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $487 $900 Implemented
BD0285 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $995 $675 Not Implemented
BD0285 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,695 $0 Implemented
BD0285 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,976 $4,080 Implemented
BD0285 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $2,695 Implemented