IAC logo
IAC Assessment: BD0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2005
Principal Product Bed Frames
NAICS 337124 - Metal Household Furniture Manufacturing
SIC 2514 - Metal Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 125,000
Annual Production 225,000 Pieces
Production Hrs. Annual 3,770
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,439 1,855,425 kWh $0.05
Electricity Demand $11,049 5,321 kW-months/year $2.08
Electricity Fees $6,368 - $ -
Natural Gas $70,127 7,571 MMBtu $9.26
TOTAL ENERGY COSTS $180,696
RECOMMENDED SAVINGS* $27,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,706
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ lb $ $ $ $ $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,090
Cost:
$2,695
$2,289 47,486 $570 274 - - $79 - $152 - - - $2,289
47,486
kWh
$570
274
kW-months/year
-
-
lb
$79
-
$
$152
-
$
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,976
Cost:
$4,080
$2,617 54,299 $359 173 - - - - - - - - $2,617
54,299
kWh
$359
173
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,695
Cost:
-
$1,357 28,163 $338 163 - - - - - - - - $1,357
28,163
kWh
$338
163
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$995
Cost:
$675
$719 14,914 $276 1,363 - - - - - - - - $719
14,914
kWh
$276
1,363
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$487
Cost:
$900
$330 6,827 $157 75 - - - - - - - - $330
6,827
kWh
$157
75
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$488
Cost:
-
- - $488 235 - - - - - - - - -
-
kWh
$488
235
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$370
Cost:
$360
$193 3,995 $11 6 - - $69 - $97 - - - $193
3,995
kWh
$11
6
kW-months/year
-
-
lb
$69
-
$
$97
-
$
-
-
Tgal
08: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$11,600
Cost:
$480
- - - - $11,600 78,000 - - - - - - -
-
kWh
-
-
kW-months/year
$11,600
78,000
lb
-
-
$
-
-
$
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$3,135
Cost:
$1,320
- - - - - - - - - - $3,135 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$3,135
-
Tgal
10: 4.6320 CHANGE OPERATING CONDITIONS Savings:
$2,898
Cost:
$2,500
- - $2,898 1,393 - - - - - - - - -
-
kWh
$2,898
1,393
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$27,734
Cost:
$13,010
$7,505 155,684 $5,097 3,682 $11,600 78,000 $148 - $249 - $3,135 - $7,505
155,684
kWh
$5,097
3,682
kW-months/year
$11,600
78,000
lb
$148
-
$
$249
-
$
$3,135
-
Tgal
TOTAL IMPLEMENTED Savings:
$20,706
Cost:
$8,515
$6,786 140,770 $1,923 926 $11,600 78,000 $148 - $249 - - - $6,786
140,770
kWh
$1,923
926
kW-months/year
$11,600
78,000
lb
$148
-
$
$249
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Water Consumption