Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsNAICS | 337127 | Institutional Furniture Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1086 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,012 | $1,489 | Implemented |
OK1086 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $630 | $330 | Implemented |
OK1086 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,948 | $382,200 | Not Implemented |
OK1086 # 03 Y:2023 | 03 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $8,472 | $13,560 | Not Implemented |
UU0212 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $382 | $1,370 | Not Implemented |
UU0213 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $5,181 | $18,250 | Not Implemented |
UU0213 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $1,190 | $3,000 | Not Implemented |
UU0213 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $639 | $1,950 | Not Implemented |
UU0213 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,602 | $1,773 | Not Implemented |
UU0212 # 01 Y:2023 | 01 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,149 | $8,500 | Not Implemented |
UU0212 # 06 Y:2023 | 06 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $425 | $850 | Not Implemented |
UU0212 # 02 Y:2023 | 02 | 2023 | REPLACE BOILER | $11,580 | $80,000 | Not Implemented |
UU0212 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,326 | $21,555 | Not Implemented |
UU0212 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,400 | $9,000 | Not Implemented |
UU0213 # 01 Y:2023 | 01 | 2023 | USE POWER DURING OFF-PEAK PERIODS | $7,487 | $8,000 | Not Implemented |
UU0212 # 05 Y:2023 | 05 | 2023 | USE OPTIMUM THICKNESS INSULATION | $4,220 | $4,402 | Not Implemented |
UF0559 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $602 | $0 | Implemented |
UF0559 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $42,076 | $359,360 | Not Implemented |
UF0559 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,328 | $5,468 | Implemented |
UF0559 # 02 Y:2020 | 02 | 2020 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $19,566 | $32,210 | Implemented |
UF0559 # 04 Y:2020 | 04 | 2020 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $3,003 | $750 | Implemented |
UF0559 # 05 Y:2020 | 05 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,600 | $3,317 | Implemented |
UF0559 # 08 Y:2020 | 08 | 2020 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $5,262 | $7,180 | Implemented |
UF0559 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,767 | $956 | Implemented |
NC0607 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $468 | $1,500 | Implemented |