IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

528

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0385 # 14 Y:2008 14 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $324 $50 Not Implemented
MZ0024 # 01 Y:2008 01 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $764 $900 Implemented
MZ0024 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,181 $32,800 Implemented
MZ0024 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $828 $370 Not Implemented
MZ0024 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,506 $5,600 Not Implemented
MZ0024 # 05 Y:2008 05 2008 USE OPTIMUM THICKNESS INSULATION $430 $800 Not Implemented
DL0020 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $55,000 $30,000 Not Implemented
DL0020 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $29,300 $125,000 Not Implemented
DL0020 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,000 $13,700 Not Implemented
DL0020 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,334 $34,037 Implemented
DL0020 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $350 Implemented
DL0020 # 06 Y:2008 06 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $63 $130 Not Implemented
LE0266 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $42,137 $2,614 Implemented
LE0266 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,436 $1,860 Not Implemented
LE0266 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,346 $1,000 Not Implemented
LE0266 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,847 $400 Not Implemented
LE0266 # 05 Y:2008 05 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,436 $2,500 Not Implemented
LE0266 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,255 $200 Not Implemented
LE0266 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,535 $3,823 Not Implemented
LE0266 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $751 $300 Not Implemented
UD0772 # 01 Y:2007 01 2007 $144,431 $0 Implemented
UD0772 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,082 $161,076 Implemented
UD0772 # 03 Y:2007 03 2007 REDUCE VENTILATION AIR $19,800 $1,590 Not Implemented
UD0772 # 04 Y:2007 04 2007 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $14,325 $3,260 Not Implemented
UD0772 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,452 $71,033 Not Implemented