IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0213 # 03 Y:2019 03 2019 UPGRADE CONTROLS ON COMPRESSORS $2,641 $1,928 Not Implemented
IC0213 # 02 Y:2019 02 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,245 $9,440 Implemented
IC0213 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,793 $36,662 Not Implemented
IC0213 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,122 $145 Implemented
UM0486 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $342 $1,500 n/a
UM0486 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,120 $18,000 n/a
UM0486 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $896 $2,400 n/a
UM0486 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,932 $3,000 n/a
UMS012 # 02 Y:2012 02 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $553,000 $750,000 Not Implemented
UMS012 # 01 Y:2012 01 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $347,000 $600,000 Not Implemented
UM0361 # 07 Y:2010 07 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,227 $650 Implemented
UM0361 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $355 $750 Implemented
UM0361 # 09 Y:2010 09 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $396 $400 Implemented
UM0361 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,137 $5,520 Implemented
UM0361 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,522 $600 Implemented
UM0361 # 05 Y:2010 05 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,810 $5,718 Not Implemented
UM0361 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,484 $1,200 Implemented
UM0361 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,000 $31,000 Implemented
UM0361 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,763 $100 Not Implemented
UM0361 # 01 Y:2010 01 2010 BURN WOOD BY-PRODUCTS FOR HEAT $79,685 $67,199 Not Implemented
IC0093 # 01 Y:2004 01 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,168 $3,600 Implemented
IC0093 # 06 Y:2004 06 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $803 $300 Not Implemented
IC0093 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,595 $34,679 Not Implemented
IC0093 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
IC0093 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,546 $700 Implemented