IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 3372 Office Furniture (including Fixtures) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1088 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,165 $953 n/a
UD1088 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,698 $6,900 n/a
UD1088 # 03 Y:2024 03 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,590 $400 n/a
UD1088 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,430 $48,200 n/a
UD1088 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,017 $0 n/a
UD1088 # 06 Y:2024 06 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $392 $1,225 n/a
WV0385 # 05 Y:2008 05 2008 STANDARDIZE MOTOR INVENTORY $6,638 $763 Implemented
WV0385 # 13 Y:2008 13 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $527 $100 Implemented
WV0385 # 10 Y:2008 10 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,986 $792 Implemented
WV0385 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $40,090 $4,000 Not Implemented
WV0385 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,198 $81,425 Implemented
WV0385 # 04 Y:2008 04 2008 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,783 $5,000 Not Implemented
WV0385 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,980 $0 Implemented
WV0385 # 03 Y:2008 03 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $14,879 $21,600 Not Implemented
WV0385 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,425 $4,393 Implemented
WV0385 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,599 $548 Implemented
WV0385 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $3,100 $140 Implemented
WV0385 # 09 Y:2008 09 2008 IMPROVE LUBRICATION PRACTICES $2,864 $2,950 Not Implemented
WV0385 # 12 Y:2008 12 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,167 $925 Not Implemented
WV0385 # 14 Y:2008 14 2008 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $324 $50 Not Implemented
UD0759 # 09 Y:2007 09 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $173 $0 Not Implemented
UD0759 # 06 Y:2007 06 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $500 Implemented
UD0759 # 05 Y:2007 05 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,440 $0 Implemented
UD0759 # 04 Y:2007 04 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,276 $0 Implemented
UD0759 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $7,675 $0 Implemented