Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 3372 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0380 # 06 Y:2010 | 06 | 2010 | USE SYNTHETIC LUBRICANT | $873 | $600 | Not Implemented |
BD0380 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,119 | $1,500 | Not Implemented |
BD0380 # 04 Y:2010 | 04 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,681 | $420 | Not Implemented |
BD0380 # 03 Y:2010 | 03 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,388 | $3,780 | Not Implemented |
BD0380 # 02 Y:2010 | 02 | 2010 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $6,928 | $11 | Implemented |
BD0380 # 01 Y:2010 | 01 | 2010 | INSTALL OCCUPANCY SENSORS | $15,800 | $18,200 | Not Implemented |
BD0380 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $748 | $21 | Not Implemented |
BD0380 # 08 Y:2010 | 08 | 2010 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,554 | $2,750 | Not Implemented |
UA0045 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,354 | $253 | Implemented |
UA0045 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $65,946 | $165,576 | Not Implemented |
UA0045 # 03 Y:2010 | 03 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $53,011 | $50,388 | Not Implemented |
UA0045 # 04 Y:2010 | 04 | 2010 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $29,964 | $19,014 | Not Implemented |
UA0045 # 05 Y:2010 | 05 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,323 | $0 | Implemented |
UA0045 # 06 Y:2010 | 06 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $35,672 | $740 | Not Implemented |
UA0045 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,056 | $4,100 | Not Implemented |
UA0045 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,605 | $5,500 | Implemented |
UA0045 # 10 Y:2010 | 10 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,837 | $10,250 | Not Implemented |
UA0045 # 09 Y:2010 | 09 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,519 | $3,616 | Not Implemented |
UM0361 # 08 Y:2010 | 08 | 2010 | INSTALL OCCUPANCY SENSORS | $1,137 | $5,520 | Implemented |
UM0361 # 07 Y:2010 | 07 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,227 | $650 | Implemented |
UM0361 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,522 | $600 | Implemented |
UM0361 # 05 Y:2010 | 05 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,810 | $5,718 | Not Implemented |
UM0361 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,484 | $1,200 | Implemented |
UM0361 # 03 Y:2010 | 03 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,000 | $31,000 | Implemented |
UM0361 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,763 | $100 | Not Implemented |