Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 33721 | Office Furniture (including Fixtures) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1088 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,165 | $953 | n/a |
UD1088 # 02 Y:2024 | 02 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,698 | $6,900 | n/a |
UD1088 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,590 | $400 | n/a |
UD1088 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,430 | $48,200 | n/a |
UD1088 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,017 | $0 | n/a |
UD1088 # 06 Y:2024 | 06 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $392 | $1,225 | n/a |
WV0385 # 05 Y:2008 | 05 | 2008 | STANDARDIZE MOTOR INVENTORY | $6,638 | $763 | Implemented |
WV0385 # 13 Y:2008 | 13 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $527 | $100 | Implemented |
WV0385 # 10 Y:2008 | 10 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,986 | $792 | Implemented |
WV0385 # 01 Y:2008 | 01 | 2008 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $40,090 | $4,000 | Not Implemented |
WV0385 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,198 | $81,425 | Implemented |
WV0385 # 04 Y:2008 | 04 | 2008 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $14,783 | $5,000 | Not Implemented |
WV0385 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,980 | $0 | Implemented |
WV0385 # 03 Y:2008 | 03 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,879 | $21,600 | Not Implemented |
WV0385 # 11 Y:2008 | 11 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,425 | $4,393 | Implemented |
WV0385 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,599 | $548 | Implemented |
WV0385 # 07 Y:2008 | 07 | 2008 | INSULATE BARE EQUIPMENT | $3,100 | $140 | Implemented |
WV0385 # 09 Y:2008 | 09 | 2008 | IMPROVE LUBRICATION PRACTICES | $2,864 | $2,950 | Not Implemented |
WV0385 # 12 Y:2008 | 12 | 2008 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,167 | $925 | Not Implemented |
WV0385 # 14 Y:2008 | 14 | 2008 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $324 | $50 | Not Implemented |
UD0759 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $173 | $0 | Not Implemented |
UD0759 # 06 Y:2007 | 06 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $664 | $500 | Implemented |
UD0759 # 05 Y:2007 | 05 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,440 | $0 | Implemented |
UD0759 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,276 | $0 | Implemented |
UD0759 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,675 | $0 | Implemented |