IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
NAICS 337215 Showcase, Partition, Shelving, and Locker Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0500 # 02 Y:2013 02 2013 MAKE A NEW BY-PRODUCT $86,815 $250,000 Implemented
NC0500 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $4,146 $200 Implemented
NC0500 # 04 Y:2013 04 2013 REDUCE FLUID FLOW RATES $34,287 $18,000 Implemented
NC0500 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $100 Implemented
NC0500 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,293 $125 Implemented
NC0500 # 07 Y:2013 07 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $577 $875 Implemented
NC0500 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $9,389 $7,000 Implemented
NC0500 # 10 Y:2013 10 2013 METER WASTE WATER $4,155 $4,200 Implemented
NC0500 # 12 Y:2013 12 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,622 $775 Implemented
NC0450 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $31,614 $21,400 Implemented
NC0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,109 $100 Implemented
NC0450 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,655 $98,739 Implemented
NC0450 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,286 $973 Implemented
NC0450 # 07 Y:2012 07 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $113,534 $25,000 Implemented
NC0450 # 08 Y:2012 08 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $105,000 $40,000 Implemented
NC0450 # 09 Y:2012 09 2012 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $38,389 $30,000 Implemented