Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,655
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0743 # 03 Y:2021 | 03 | 2021 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $29,553 | $281,475 | Implemented |
AM0827 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $13,390 | $30,920 | Implemented |
AM0827 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,760 | $1,300 | Implemented |
AM0827 # 03 Y:2021 | 03 | 2021 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,630 | $0 | Implemented |
AM0827 # 04 Y:2021 | 04 | 2021 | PAY UTILITY BILLS ON TIME | $1,766 | $0 | Implemented |
MA0825 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $93,702 | $30,000 | Implemented |
MA0825 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $54,067 | $150,000 | Implemented |
MA0825 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $41,012 | $52,945 | Implemented |
MA0825 # 04 Y:2021 | 04 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $35,925 | $3,200 | Not Implemented |
MA0825 # 05 Y:2021 | 05 | 2021 | MINIMIZE WATER USAGE | $24,897 | $6,250 | Implemented |
OK1051 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,640 | $7,393 | Implemented |
OK1051 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $8,210 | $4,500 | Not Implemented |
OK1051 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,614 | $677 | Implemented |
OK1051 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,449 | $0 | Not Implemented |
MI0388 # 01 Y:2021 | 01 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $132,105 | $960 | Not Implemented |
MI0388 # 02 Y:2021 | 02 | 2021 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $86,796 | $86,796 | Not Implemented |
MI0388 # 03 Y:2021 | 03 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,022 | $38,081 | Implemented |
MI0388 # 04 Y:2021 | 04 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $31,640 | $80 | Implemented |
MI0388 # 05 Y:2021 | 05 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $13,798 | $4,080 | Implemented |
OK1050 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,327 | $0 | Not Implemented |
OK1050 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,760 | $900 | Implemented |
OK1050 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,379 | $1,973 | Not Implemented |
IP0146 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $469 | $0 | Implemented |
IP0146 # 02 Y:2021 | 02 | 2021 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $7,392 | $260 | Implemented |
IP0146 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,150 | $50 | Implemented |