IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,640

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0638 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,488 $2,450 Not Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
NC0373 # 01 Y:2008 01 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,343 $15,000 Not Implemented
NC0373 # 02 Y:2008 02 2008 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $13,018 $26,250 Not Implemented
NC0373 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $100 Implemented
NC0373 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,993 $16,000 Not Implemented
NC0373 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,639 $5,398 Implemented
NC0373 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $9,158 Implemented
TT0016 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $17,400 $50,000 Implemented
TT0016 # 02 Y:2008 02 2008 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,929 $1,500 Not Implemented
TT0016 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,553 $42,900 Implemented
TT0016 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $19,000 $19,750 Not Implemented
WV0368 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $11,312 $2,971 Implemented
WV0368 # 02 Y:2008 02 2008 ELIMINATE/REDUCE AN OPERATION $1,977 $1,750 Implemented
WV0368 # 03 Y:2008 03 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $825 $140 Not Implemented
WV0368 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $747 $1,927 Implemented
WV0368 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $296 $600 Not Implemented
WV0368 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $181 $60 Implemented
UD0771 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,208 $22,275 Not Implemented
UD0771 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,342 $600 Not Implemented
UD0771 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,341 $7,780 Not Implemented
UD0771 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $8,838 Not Implemented
UD0771 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $10,000 Not Implemented
UD0771 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $0 Implemented
UD0771 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $3,285 Not Implemented