Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
242
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0667 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,797 | $0 | n/a |
SD0667 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,190 | $8,318 | n/a |
SD0667 # 06 Y:2025 | 06 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $17,049 | $46,406 | n/a |
SD0667 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $3,727 | n/a |
SD0667 # 04 Y:2025 | 04 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,121 | $299 | n/a |
SD0667 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $418,912 | $524,659 | n/a |
SD0667 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $260,930 | $10,784 | n/a |
SD0664 # 05 Y:2025 | 05 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $107,677 | $47,756 | n/a |
SD0664 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,187 | $1,186 | n/a |
SD0664 # 09 Y:2025 | 09 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,377 | $250 | n/a |
SD0664 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,835 | $3,044 | n/a |
SD0664 # 08 Y:2025 | 08 | 2025 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $16,147 | $6,200 | n/a |
SD0664 # 06 Y:2025 | 06 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $15,250 | $16,600 | n/a |
SD0664 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $82,562 | $4,772 | n/a |
SD0664 # 03 Y:2025 | 03 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,786 | $6,845 | n/a |
SD0664 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $564,124 | $638,912 | n/a |
SD0649 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $657,585 | $0 | Not Implemented |
SD0649 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,035 | $39,675 | Not Implemented |
SD0649 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $742,364 | $1,089,169 | Not Implemented |
SD0649 # 09 Y:2024 | 09 | 2024 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $12,769 | $40,200 | Not Implemented |
SD0649 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $142,164 | $183,960 | Not Implemented |
SD0649 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $570,483 | $0 | Not Implemented |
SD0649 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,802 | $16,517 | Implemented |
SD0649 # 07 Y:2024 | 07 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40,936 | $125,410 | Implemented |
SD0649 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $916 | $3,000 | Not Implemented |