Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0646 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,960 | $12,682 | Implemented |
WV0646 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $357 | $407 | Implemented |
WV0646 # 15 Y:2023 | 15 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $419 | $909 | Implemented |
WV0646 # 14 Y:2023 | 14 | 2023 | INSTALL OCCUPANCY SENSORS | $644 | $1,312 | Implemented |
WV0646 # 13 Y:2023 | 13 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $669 | $1,895 | Implemented |
WV0646 # 12 Y:2023 | 12 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,904 | $1,500 | Implemented |
WV0646 # 11 Y:2023 | 11 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,436 | $1,807 | Implemented |
WV0646 # 10 Y:2023 | 10 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,040 | $9,723 | Not Implemented |
WV0646 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $3,094 | $1,481 | Implemented |
WV0646 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,490 | $301 | Implemented |
WV0646 # 07 Y:2023 | 07 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,257 | $16,181 | Not Implemented |
WV0646 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,758 | $31,568 | Implemented |
WV0646 # 04 Y:2023 | 04 | 2023 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $9,785 | $48,224 | Not Implemented |
WV0646 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,692 | $89,814 | Not Implemented |
WV0646 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $37,824 | $112,795 | Not Implemented |
WV0646 # 01 Y:2023 | 01 | 2023 | MINIMIZE WATER USAGE | $150,340 | $110,597 | Not Implemented |
DL0036 # 01 Y:2009 | 01 | 2009 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $26,142 | $14,000 | Not Implemented |
DL0036 # 08 Y:2009 | 08 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,742 | $10,500 | Not Implemented |
DL0036 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $231 | $594 | Not Implemented |
DL0036 # 06 Y:2009 | 06 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $596 | $0 | Implemented |
DL0036 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,231 | $0 | Implemented |
DL0036 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,127 | $1,430 | Not Implemented |
DL0036 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,802 | $4,000 | Not Implemented |
DL0036 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,987 | $18,000 | Not Implemented |