Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0196 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $0 Implemented
WM0196 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $2,381 $1,240 Not Implemented
WM0196 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,020 $1,490 Implemented
WM0196 # 06 Y:2023 06 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $544 $240 Not Implemented
WM0196 # 05 Y:2023 05 2023 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $546 $213 Implemented
WM0196 # 09 Y:2023 09 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $138 $125 Not Implemented
WM0196 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,584 $0 Implemented
WM0196 # 01 Y:2023 01 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,026 $0 Implemented
WM0196 # 10 Y:2023 10 2023 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $111 $0 Not Implemented
WM0196 # 07 Y:2023 07 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $426 $1,995 Implemented
WM0175 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98,046 $48,230 Not Implemented
WM0175 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $941,741 $1,060,000 Not Implemented
WM0175 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $447,150 $2,178,400 Not Implemented
WM0175 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $116,088 $85,000 Not Implemented
WM0175 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,473 $0 Not Implemented
WM0175 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $840,840 $38,534 Not Implemented
WM0170 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $216 $260 Implemented
WM0170 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $182 Implemented
WM0170 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $5,931 $24,300 Implemented
WM0170 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $598 $880 Not Implemented
WM0170 # 02 Y:2021 02 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $4,328 $3,000 Implemented
WM0170 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,204 $875 Not Implemented
WM0170 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,828 $1,500 Not Implemented
WM0170 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,851 $3,500 Implemented
WM0167 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,789 $0 Not Implemented