Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsNAICS | 339 | Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0196 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $2,381 | $1,240 | Not Implemented |
WM0196 # 06 Y:2023 | 06 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $544 | $240 | Not Implemented |
WM0196 # 07 Y:2023 | 07 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $426 | $1,995 | Implemented |
WM0196 # 10 Y:2023 | 10 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $111 | $0 | Not Implemented |
WM0196 # 01 Y:2023 | 01 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,026 | $0 | Implemented |
WM0196 # 05 Y:2023 | 05 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $546 | $213 | Implemented |
WM0196 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,584 | $0 | Implemented |
WM0196 # 08 Y:2023 | 08 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $0 | Implemented |
WM0196 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,020 | $1,490 | Implemented |
WM0196 # 09 Y:2023 | 09 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $138 | $125 | Not Implemented |
WM0175 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $116,088 | $85,000 | Not Implemented |
WM0175 # 06 Y:2022 | 06 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $6,473 | $0 | Not Implemented |
WM0175 # 05 Y:2022 | 05 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $98,046 | $48,230 | Not Implemented |
WM0175 # 03 Y:2022 | 03 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $447,150 | $2,178,400 | Not Implemented |
WM0175 # 01 Y:2022 | 01 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $941,741 | $1,060,000 | Not Implemented |
WM0175 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $840,840 | $38,534 | Not Implemented |
WM0170 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $330 | $182 | Implemented |
WM0170 # 08 Y:2021 | 08 | 2021 | INSTALL OCCUPANCY SENSORS | $216 | $260 | Implemented |
WM0170 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $598 | $880 | Not Implemented |
WM0170 # 01 Y:2021 | 01 | 2021 | OPTIMIZE PLANT POWER FACTOR | $5,931 | $24,300 | Implemented |
WM0170 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,851 | $3,500 | Implemented |
WM0170 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,828 | $1,500 | Not Implemented |
WM0170 # 02 Y:2021 | 02 | 2021 | INSTALL SPECTRAL REFLECTORS / DELAMP | $4,328 | $3,000 | Implemented |
WM0170 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,204 | $875 | Not Implemented |
WM0167 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,266 | $0 | Not Implemented |