IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0555 # 01 Y:2017 01 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $18,916 $65,600 Not Implemented
SD0555 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $445 $850 Not Implemented
SD0555 # 03 Y:2017 03 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,035 $6,550 Not Implemented
SD0555 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,771 $1,100 Implemented
OR0690 # 01 Y:2017 01 2017 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,526 $429 Not Implemented
OR0690 # 02 Y:2017 02 2017 USE RADIANT HEATER FOR SPOT HEATING $1,989 $1,874 Not Implemented
OR0690 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,285 $2,321 Implemented
NL0008 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,345 $0 Implemented
NL0008 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,330 $14,200 Implemented
NL0008 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $4,600 Implemented
NL0008 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $111 $0 Not Implemented
LE0441 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,114 $20 Implemented
LE0441 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,738 $1,000 Implemented
LE0441 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $57,323 $15,000 Not Implemented
LE0441 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $831 $1,000 Not Implemented
LE0441 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,845 $16,000 Not Implemented
LE0441 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $780 $2,067 Implemented
LE0441 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,133 $9,520 Implemented
LE0441 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,712 $20 Not Implemented
MI0315 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,093 $5,340 Implemented
MI0315 # 07 Y:2017 07 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,476 $6,800 Implemented
MI0315 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $9,833 $434 Implemented
MI0315 # 05 Y:2017 05 2017 USE OPTIMUM THICKNESS INSULATION $10,994 $1,320 Not Implemented
MI0315 # 03 Y:2017 03 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,532 $1,560 Not Implemented
MI0315 # 02 Y:2017 02 2017 REPLACE BOILER $28,850 $36,000 Implemented