Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
120
matching recommendationsNAICS | 3391 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0429 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,739 | $1,660 | Implemented |
MI0429 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,166 | $12,997 | Implemented |
UF0589 # 08 Y:2023 | 08 | 2023 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $13,274 | $30,000 | Implemented |
UF0589 # 11 Y:2023 | 11 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,770 | $2,800 | Implemented |
UF0589 # 12 Y:2023 | 12 | 2023 | INSTALL TURBULATORS | $4,595 | $7,500 | Implemented |
UF0589 # 13 Y:2023 | 13 | 2023 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $4,532 | $754 | Implemented |
UF0589 # 07 Y:2023 | 07 | 2023 | CLEAN CONDENSER TUBES | $15,589 | $0 | Implemented |
UF0589 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $18,200 | $14,400 | Implemented |
UF0589 # 04 Y:2023 | 04 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $71,810 | $25,340 | Implemented |
UF0589 # 14 Y:2023 | 14 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,316 | $3,069 | Implemented |
UF0589 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,787 | $43,077 | Implemented |
UF0589 # 09 Y:2023 | 09 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,438 | $0 | Implemented |
UF0589 # 10 Y:2023 | 10 | 2023 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $5,304 | $4,300 | Implemented |
UF0589 # 17 Y:2023 | 17 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $88,974 | $10,000 | Implemented |
UF0589 # 15 Y:2023 | 15 | 2023 | INSTALL OCCUPANCY SENSORS | $2,868 | $9,968 | Implemented |
UF0589 # 16 Y:2023 | 16 | 2023 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $2,322 | $0 | Implemented |
UF0589 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $920,434 | $2,793,000 | Implemented |
UF0589 # 02 Y:2023 | 02 | 2023 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $505,092 | $2,115,660 | Implemented |
MI0416 # 05 Y:2022 | 05 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,879 | $2,399 | Implemented |
MI0416 # 06 Y:2022 | 06 | 2022 | PAY UTILITY BILLS ON TIME | $6,239 | $0 | Implemented |
MI0416 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,973 | $2,100 | Implemented |
MI0416 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,652 | $480 | Implemented |
MI0416 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,300 | $580 | Implemented |
MI0416 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,412 | $20,515 | Implemented |
MI0416 # 08 Y:2022 | 08 | 2022 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,431 | $280 | Implemented |