IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,167

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0434 # 15 Y:2010 15 2010 RECYCLE FLUORESCENT LAMPS $571 $3,405 Not Implemented
MA0662 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,395 $2,265 Implemented
MA0662 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $2,158 $3,935 Implemented
MA0662 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,305 $4,995 Not Implemented
MA0662 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,287 $5,324 Not Implemented
MA0662 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $1,011 $1,760 Implemented
MA0662 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $883 $1,500 Implemented
MA0662 # 07 Y:2010 07 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $680 $2,000 Implemented
MA0662 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $644 $640 Implemented
MA0662 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $547 $1,740 Implemented
IC0166 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,511 $10,994 Implemented
IC0166 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,135 $4,045 Not Implemented
IC0166 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $136 Not Implemented
IC0166 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,442 $1,720 Not Implemented
IC0166 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $84 $345 Implemented
IC0166 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $134 $0 Implemented
IC0166 # 07 Y:2009 07 2009 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,264 $16,200 Not Implemented
IC0166 # 08 Y:2009 08 2009 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $0 Not Implemented
MA0650 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,218 $10,000 Not Implemented
MA0650 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,735 $0 Implemented
MA0650 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $581 $2,300 Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented
MA0650 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $0 Implemented
UF0419 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,291 $0 Not Implemented
UF0419 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented