IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,264

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2316 # 07 Y:2023 07 2023 REPLACE BOILER $177,614 $423,535 Not Implemented
UC2316 # 08 Y:2023 08 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $22,194 $134,412 Not Implemented
UC2316 # 09 Y:2023 09 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $1,380,736 $10,992,131 Not Implemented
UC2316 # 10 Y:2023 10 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $20,195 $268,543 Not Implemented
MI0429 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $172,404 $974,914 Not Implemented
MI0429 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,739 $1,660 Implemented
MI0429 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,267 $0 Not Implemented
MI0429 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,344 $70,840 Not Implemented
MI0429 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,166 $12,997 Implemented
MI0429 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,831 $6,950 Not Implemented
MI0429 # 07 Y:2023 07 2023 USE SOLAR HEAT TO HEAT WATER $1,687 $8,166 Not Implemented
MI0429 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $1,608 $1,012 Not Implemented
UU0231 # 01 Y:2023 01 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,636 $127,500 Not Implemented
UU0231 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,519 $14,890 Implemented
UU0231 # 03 Y:2023 03 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,518 $19,160 Implemented
UU0231 # 04 Y:2023 04 2023 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,026 $30,128 Not Implemented
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 Implemented
UC2314 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,543 $0 Not Implemented
UC2314 # 02 Y:2023 02 2023 PAY UTILITY BILLS ON TIME $3,211 $0 Not Implemented
UC2314 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,655 $1,283 Not Implemented
UC2314 # 04 Y:2023 04 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,943 $21,500 Not Implemented
UC2314 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $2,702 $800 Implemented
UC2314 # 06 Y:2023 06 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $627 $1,061 Not Implemented
UC2314 # 07 Y:2023 07 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,082 $1,674 Not Implemented
UC2314 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,033 $0 Not Implemented