IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

1,004

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0343 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,400 $71,328 Implemented
MI0343 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,044 $2,973 Not Implemented
MI0343 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,421 $1,005 Not Implemented
MI0343 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,552 $7,675 Implemented
MI0343 # 09 Y:2018 09 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,896 $6,486 Implemented
MI0342 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $56,921 $3,280 Implemented
MI0342 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $48,793 $800 Implemented
MI0342 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $32,500 $15,000 Implemented
MI0342 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $15,291 $14,298 Implemented
MI0342 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $4,165 Implemented
MI0342 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $3,475 $14,430 Not Implemented
MI0342 # 07 Y:2018 07 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $770 $80 Implemented
UF0518 # 01 Y:2018 01 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $24,028 $167,216 Implemented
UF0518 # 02 Y:2018 02 2018 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,684 $1,980 Implemented
UF0518 # 03 Y:2018 03 2018 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,844 $586 Implemented
UF0518 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,401 $0 Implemented
UF0518 # 05 Y:2018 05 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,145 $9,600 Implemented
UF0518 # 06 Y:2018 06 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $109,000 $41,200 Implemented
MI0337 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,349 $76,979 Implemented
MI0337 # 02 Y:2018 02 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,184 $480 Implemented
MI0337 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,197 $11,846 Not Implemented
MI0337 # 04 Y:2018 04 2018 INSULATE BARE EQUIPMENT $26,104 $3,000 Implemented
MI0337 # 05 Y:2018 05 2018 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $24,458 $31,600 Not Implemented
MI0337 # 06 Y:2018 06 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $21,780 $78,320 Not Implemented
MI0337 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,813 $2,030 Implemented