IAC Assessment: SD0638
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0638
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2023
Principal Product Silicon Rubber Medical Components
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 119
Plant Area (Sq.Ft.) 39,150
Annual Production 302,000,000 Units
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $367,406 2,469,737 kWh $0.15
Electricity Demand $277,227 4,655 kW-months/year $59.55
Electricity Fees $6,486 - $ -
TOTAL ENERGY COSTS $651,119
RECOMMENDED SAVINGS* $466,267 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $105,397
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,975
Cost:
$46,984
$13,220 88,842 $11,755 197 - - $13,220
88,842
kWh
$11,755
197
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,403
Cost:
$3,320
$1,552 10,428 $852 14 - - $1,552
10,428
kWh
$852
14
kW-months/year
-
-
$
03: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$161
Cost:
$250
$48 322 $113 2 - - $48
322
kWh
$113
2
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$59,928
Cost:
$104,792
$33,250 223,457 $26,678 448 - - $33,250
223,457
kWh
$26,678
448
kW-months/year
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$816
Cost:
$799
$435 2,919 $381 6 - - $435
2,919
kWh
$381
6
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,358
Cost:
$4,547
$1,079 7,245 $1,258 21 $21 - $1,079
7,245
kWh
$1,258
21
kW-months/year
$21
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$740
Cost:
$500
$475 3,183 $265 4 - - $475
3,183
kWh
$265
4
kW-months/year
-
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$208,310
Cost:
$270,000
$79,682 535,500 $128,628 2,160 - - $79,682
535,500
kWh
$128,628
2,160
kW-months/year
-
-
$
09: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$47,916
Cost:
-
$(-7,942) (-53,370) $55,858 938 - - $(-7,942)
(-53,370)
kWh
$55,858
938
kW-months/year
-
-
$
10: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$4,339
Cost:
$5,400
$4,339 29,159 - - - - $4,339
29,159
kWh
-
-
kW-months/year
-
-
$
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,174
Cost:
$306
$6,174 41,490 - - - - $6,174
41,490
kWh
-
-
kW-months/year
-
-
$
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,093
Cost:
-
$5,093 34,230 - - - - $5,093
34,230
kWh
-
-
kW-months/year
-
-
$
13: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$98,322
Cost:
$418,100
$59,448 399,514 $38,874 653 - - $59,448
399,514
kWh
$38,874
653
kW-months/year
-
-
$
14: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$4,732
Cost:
$1,488
$2,648 17,798 $2,084 35 - - $2,648
17,798
kWh
$2,084
35
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$466,267
Cost:
$856,486
$199,501 1,340,717 $266,745 4,479 $21 - $199,501
1,340,717
kWh
$266,745
4,479
kW-months/year
$21
-
$
TOTAL IMPLEMENTED Savings:
$105,397
Cost:
$419,156
$66,145 444,509 $39,252 659 - - $66,145
444,509
kWh
$39,252
659
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes