Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0710 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,710 $340 Implemented
CO0710 # 01 Y:2015 01 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,950 $3,660 Not Implemented
CO0710 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $1,170 Not Implemented
CO0710 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $60 Implemented
CO0686 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $4,630 Not Implemented
CO0686 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $1,500 Implemented
CO0686 # 04 Y:2014 04 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,330 $27,820 Implemented
CO0686 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,690 $0 Implemented
CO0686 # 02 Y:2014 02 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,170 $6,690 Not Implemented
CO0686 # 01 Y:2014 01 2014 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,160 $8,890 Not Implemented
CO0581 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $430 Not Implemented
CO0581 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,580 $18,370 Not Implemented
CO0581 # 05 Y:2006 05 2006 USE SOLAR HEAT TO HEAT MAKE-UP AIR $4,140 $36,720 Not Implemented
CO0581 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,710 $18,130 Not Implemented
CO0581 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,190 $14,660 Not Implemented
CO0581 # 01 Y:2006 01 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,180 $450 Implemented
CO0560 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,230 $130 Implemented
CO0560 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,390 $15,681 Implemented
CO0560 # 09 Y:2004 09 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,800 $10,610 Not Implemented
CO0560 # 08 Y:2004 08 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $530 $0 Implemented
CO0560 # 07 Y:2004 07 2004 USE A DIFFERENT OR RECYCLED RAW MATERIAL $650 $0 Not Implemented
CO0560 # 06 Y:2004 06 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $990 $800 Not Implemented
CO0560 # 05 Y:2004 05 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,520 $160 Implemented
CO0560 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,210 $0 Not Implemented
CO0560 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $654 $944 Implemented