IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2316 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,355 $75 n/a
UC2316 # 10 Y:2023 10 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $20,195 $268,543 n/a
UC2316 # 09 Y:2023 09 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $1,380,736 $10,992,131 n/a
UC2316 # 08 Y:2023 08 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $22,194 $134,412 n/a
UC2316 # 07 Y:2023 07 2023 REPLACE BOILER $177,614 $423,535 n/a
UC2316 # 06 Y:2023 06 2023 BURN A LESS EXPENSIVE GRADE OF FUEL $153,910 $207,578 n/a
UC2316 # 05 Y:2023 05 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $2,801 $12,000 n/a
UC2316 # 04 Y:2023 04 2023 INSTALL TURBULATORS $13,337 $10,920 n/a
UC2316 # 03 Y:2023 03 2023 RECOVER AND REUSE WASTE MATERIAL $76,811 $332,613 n/a
UC2316 # 02 Y:2023 02 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,167 $5,801 n/a
MA0650 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $0 Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented
MA0650 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $581 $2,300 Implemented
MA0650 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,735 $0 Implemented
MA0650 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,218 $10,000 Not Implemented
MA0623 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,848 $117,000 Not Implemented
MA0623 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $643 $460 Implemented
MA0623 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,297 $1,184 Implemented
MA0623 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,363 $50,282 Not Implemented