Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsNAICS | 3391 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0324 # 11 Y:2017 | 11 | 2017 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $670 | $100 | Not Implemented |
MI0324 # 10 Y:2017 | 10 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,051 | $1,722 | Implemented |
MI0324 # 09 Y:2017 | 09 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,760 | $250 | Not Implemented |
MI0324 # 01 Y:2017 | 01 | 2017 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $94,097 | $134,000 | Not Implemented |
MI0324 # 02 Y:2017 | 02 | 2017 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,637 | $15,056 | Implemented |
MI0324 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $28,032 | $41,300 | Implemented |
MI0324 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,387 | $8,923 | Implemented |
MI0324 # 05 Y:2017 | 05 | 2017 | COMBINE UTILITY METERS | $7,245 | $100 | Not Implemented |
MI0324 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,467 | $4,900 | Implemented |
MI0324 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,663 | $1,478 | Implemented |
MI0324 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $3,528 | $1,000 | Implemented |
NL0008 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $1,330 | $14,200 | Implemented |
NL0008 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $457 | $4,600 | Implemented |
NL0008 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $111 | $0 | Not Implemented |
NL0008 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,345 | $0 | Implemented |
MI0315 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $28,850 | $36,000 | Implemented |
MI0315 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,093 | $5,340 | Implemented |
MI0315 # 07 Y:2017 | 07 | 2017 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $6,476 | $6,800 | Implemented |
MI0315 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $9,833 | $434 | Implemented |
MI0315 # 05 Y:2017 | 05 | 2017 | USE OPTIMUM THICKNESS INSULATION | $10,994 | $1,320 | Not Implemented |
MI0315 # 04 Y:2017 | 04 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,687 | $960 | Implemented |
MI0315 # 03 Y:2017 | 03 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,532 | $1,560 | Not Implemented |
MI0315 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $60,269 | $1,660 | Implemented |
UU0118 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,762 | $0 | Not Implemented |
UU0118 # 02 Y:2017 | 02 | 2017 | USE OPTIMUM TEMPERATURE | $7,381 | $0 | Implemented |