IAC logo
IAC Assessment: MI0324
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0324
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2017
Principal Product Surgical tools
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 66,000
Annual Production 84,000,000 Units
Production Hrs. Annual 8,568
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $581,299 3,689,275 kWh $0.16
Electricity Demand $82,454 10,572 kW-months/year $7.80
Electricity Fees $8,090 - $ -
TOTAL ENERGY COSTS $671,843
RECOMMENDED SAVINGS* $182,536 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,765
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$94,097
Cost:
$134,000
$83,336 527,446 $5,761 739 - - $5,000 - $83,336
527,446
kWh
$5,761
739
kW-months/year
-
-
$
$5,000
-
$
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$28,637
Cost:
$15,056
$26,785 169,528 $1,852 237 - - - - $26,785
169,528
kWh
$1,852
237
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$28,032
Cost:
$41,300
- - $28,032 3,602 - - - - -
-
kWh
$28,032
3,602
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,387
Cost:
$8,923
$7,856 49,722 $531 68 - - - - $7,856
49,722
kWh
$531
68
kW-months/year
-
-
$
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$7,245
Cost:
$100
- - $4,845 600 $2,400 - - - -
-
kWh
$4,845
600
kW-months/year
$2,400
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,467
Cost:
$4,900
$5,467 34,602 - - - - - - $5,467
34,602
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,663
Cost:
$1,478
$3,430 21,706 $233 30 - - - - $3,430
21,706
kWh
$233
30
kW-months/year
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,528
Cost:
$1,000
$3,528 22,327 - - - - - - $3,528
22,327
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,760
Cost:
$250
$1,645 10,410 $115 15 - - - - $1,645
10,410
kWh
$115
15
kW-months/year
-
-
$
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,051
Cost:
$1,722
$983 6,221 $68 9 - - - - $983
6,221
kWh
$68
9
kW-months/year
-
-
$
-
-
$
11: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$670
Cost:
$100
- - - - $670 - - - -
-
kWh
-
-
kW-months/year
$670
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$182,536
Cost:
$208,829
$133,030 841,962 $41,437 5,299 $3,070 - $5,000 - $133,030
841,962
kWh
$41,437
5,299
kW-months/year
$3,070
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$78,765
Cost:
$74,379
$48,049 304,106 $30,716 3,946 - - - - $48,049
304,106
kWh
$30,716
3,946
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes