Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,223
matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0563 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $956 | $2,850 | Implemented |
SD0563 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $620 | $600 | Implemented |
UF0516 # 01 Y:2018 | 01 | 2018 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $120,914 | $400,000 | Not Implemented |
UF0516 # 02 Y:2018 | 02 | 2018 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $6,142 | $18,013 | Implemented |
UF0516 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,159 | $12,014 | Implemented |
UF0516 # 04 Y:2018 | 04 | 2018 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $200,000 | $100,000 | Not Implemented |
UF0516 # 05 Y:2018 | 05 | 2018 | MOVE PRODUCT USING MECHANICAL MEANS | $42,000 | $70,000 | Implemented |
UF0516 # 06 Y:2018 | 06 | 2018 | INSTALL EQUIPMENT TO MOVE PRODUCT | $30,207 | $5,350 | Not Implemented |
UF0516 # 07 Y:2018 | 07 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $23,725 | $10,695 | Not Implemented |
MA0789 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,415 | $29,288 | Implemented |
MA0789 # 02 Y:2018 | 02 | 2018 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,053 | $960 | Not Implemented |
MA0789 # 03 Y:2018 | 03 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,660 | $1,200 | Not Implemented |
MA0789 # 04 Y:2018 | 04 | 2018 | REPLACE ELECTRIC REHEAT WITH HEAT PIPES | $2,881 | $6,120 | Not Implemented |
MA0789 # 05 Y:2018 | 05 | 2018 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,779 | $960 | Not Implemented |
SD0562 # 01 Y:2018 | 01 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,423 | $97,740 | Implemented |
SD0562 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,835 | $13,230 | Implemented |
SD0562 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,116 | $10,515 | Not Implemented |
SD0562 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,214 | $1,000 | Implemented |
SD0562 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,279 | $600 | Implemented |
UA0191 # 01 Y:2018 | 01 | 2018 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,889 | $37,420 | Not Implemented |
UA0191 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,914 | $0 | Implemented |
UA0191 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,060 | $34,939 | Not Implemented |
UA0191 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,326 | $2,165 | Implemented |
UA0191 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,391 | $150 | Not Implemented |
UA0191 # 06 Y:2018 | 06 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,997 | $0 | Implemented |