IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,223

matching recommendations
Reset
NAICS 33911 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0850 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,480 $0 Not Implemented
GT0850 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,447 $4,800 Not Implemented
GT0850 # 05 Y:2008 05 2008 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $23,045 $29,000 Not Implemented
GT0850 # 06 Y:2008 06 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,700 $20,540 Not Implemented
GT0850 # 07 Y:2008 07 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,170 $12,600 Not Implemented
GT0850 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,237 $7,000 Not Implemented
GT0850 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,982 $40,482 Not Implemented
GT0850 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,544 $1,580 Not Implemented
MA0638 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $43,903 $225,000 Not Implemented
MA0638 # 02 Y:2008 02 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,075 $56,000 Not Implemented
MA0638 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $12,360 $2,500 Implemented
MA0638 # 04 Y:2008 04 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $6,135 $20,000 Not Implemented
MA0638 # 05 Y:2008 05 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,325 $8,800 Not Implemented
MA0638 # 06 Y:2008 06 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,428 $16,500 Not Implemented
MA0638 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,761 $0 Implemented
MA0638 # 08 Y:2008 08 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,670 $3,000 Implemented
MA0638 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,488 $2,450 Not Implemented
MA0638 # 10 Y:2008 10 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,230 $2,000 Implemented
NC0373 # 01 Y:2008 01 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,343 $15,000 Not Implemented
NC0373 # 02 Y:2008 02 2008 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $13,018 $26,250 Not Implemented
NC0373 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $650 $100 Implemented
NC0373 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,993 $16,000 Not Implemented
NC0373 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,639 $5,398 Implemented
NC0373 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,879 $9,158 Implemented
MA0623 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,848 $117,000 Not Implemented