IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

367

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0659 # 11 Y:2024 11 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $603 $2,300 Implemented
WV0659 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,213 $1,440 Implemented
WV0659 # 06 Y:2024 06 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,611 $3,200 Implemented
WV0659 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $2,399 $4,720 Implemented
WV0659 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,554 $549 Implemented
WV0659 # 09 Y:2024 09 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $120 Implemented
WV0659 # 10 Y:2024 10 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $770 $2,660 Implemented
WV0659 # 05 Y:2024 05 2024 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,133 $19,900 Implemented
MI0437 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $127,058 $120 Implemented
MI0437 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $441 $433 Implemented
MI0429 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,739 $1,660 Implemented
MI0429 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,166 $12,997 Implemented
UU0231 # 03 Y:2023 03 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $6,518 $19,160 Implemented
UU0231 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,519 $14,890 Implemented
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 Implemented
UA0276 # 04 Y:2023 04 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,760 $35,064 Implemented
UA0276 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,109 $57,867 Implemented
UA0276 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,633 $8,591 Implemented
MI0427 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,053 $1,060 Implemented
MI0427 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,803 $791 Implemented
MI0427 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $4,697 Implemented
SF0604 # 02 Y:2023 02 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $21,457 $280 Implemented
WV0646 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $3,094 $1,481 Implemented
WV0646 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,490 $301 Implemented
WV0646 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $8,960 $12,682 Implemented