IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

374

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0432 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,790 $2,500 Implemented
WV0468 # 07 Y:2013 07 2013 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,362 $11,000 Implemented
WV0468 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,596 $31,932 Implemented
WV0468 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,463 $29,680 Implemented
WV0468 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,865 $3,830 Implemented
WV0468 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $452 $1,125 Implemented
WV0468 # 11 Y:2013 11 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $496 $30 Implemented
WV0468 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $731 $225 Implemented
WV0468 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,088 $5,770 Implemented
LE0342 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,151 $17,500 Implemented
LE0342 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,433 $40,000 Implemented
LE0342 # 07 Y:2012 07 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $24,116 $60,000 Implemented
LE0342 # 08 Y:2012 08 2012 REPAIR OR REPLACE STEAM TRAPS $1,008 $675 Implemented
LE0342 # 09 Y:2012 09 2012 REPLACE BOILER $225,837 $230,000 Implemented
LE0342 # 13 Y:2012 13 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $72,444 $410,000 Implemented
LE0342 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,722 $85,000 Implemented
UA0068 # 01 Y:2011 01 2011 INSTALL TIMERS AND/OR THERMOSTATS $16,400 $5,100 Implemented
UA0068 # 02 Y:2011 02 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,438 $13,988 Implemented
UA0068 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,451 $46,341 Implemented
LE0325 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,249 $15,615 Implemented
LE0325 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,946 $6,396 Implemented
MI0208 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $40,370 $292,600 Implemented
MI0208 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,143 $16,918 Implemented
MI0208 # 03 Y:2011 03 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $25,727 $48,170 Implemented
MI0208 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,355 $1,320 Implemented