IAC logo
IAC Assessment: DL0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2014
Principal Product Precision Machined Parts
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 60,500
Annual Production 500,000 Pieces
Production Hrs. Annual 2,500
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,768 446,000 kWh $0.13
Electricity Demand $19,720 2,260 kW-months/year $8.73
Electricity Fees $51 - $ -
Natural Gas $12,295 1,151 MMBtu $10.68
TOTAL ENERGY COSTS $88,834
RECOMMENDED SAVINGS* $28,686 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,195
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,900
Cost:
-
$16,900 135,000 - - $16,900
135,000
kWh
-
-
MMBtu
02: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$490
Cost:
-
- - $490 47 -
-
kWh
$490
47
MMBtu
03: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$340
Cost:
-
$340 2,450 - - $340
2,450
kWh
-
-
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$700
Cost:
$180
- - $700 67 -
-
kWh
$700
67
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,680
Cost:
-
$1,680 12,000 - - $1,680
12,000
kWh
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$691
Cost:
$900
$691 7,055 - - $691
7,055
kWh
-
-
MMBtu
07: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$760
Cost:
$1,220
- - $760 73 -
-
kWh
$760
73
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,125
Cost:
-
$7,125 50,895 - - $7,125
50,895
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,686
Cost:
$2,300
$26,736 207,400 $1,950 187 $26,736
207,400
kWh
$1,950
187
MMBtu
TOTAL IMPLEMENTED Savings:
$26,195
Cost:
-
$25,705 197,895 $490 47 $25,705
197,895
kWh
$490
47
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas