Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
733
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0259 # 11 Y:2014 | 11 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $80 | Implemented |
DL0124 # 01 Y:2014 | 01 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $16,900 | $0 | Implemented |
DL0124 # 02 Y:2014 | 02 | 2014 | USE OPTIMUM TEMPERATURE | $490 | $0 | Implemented |
DL0124 # 03 Y:2014 | 03 | 2014 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $340 | $0 | Not Implemented |
DL0124 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $700 | $180 | Not Implemented |
DL0124 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,680 | $0 | Implemented |
DL0124 # 06 Y:2014 | 06 | 2014 | INSTALL OCCUPANCY SENSORS | $691 | $900 | Not Implemented |
DL0124 # 07 Y:2014 | 07 | 2014 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $760 | $1,220 | Not Implemented |
DL0124 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,125 | $0 | Implemented |
UM0434 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,289 | $500 | Not Implemented |
UM0434 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,543 | $17,630 | Implemented |
UM0434 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $7,121 | $16,500 | Implemented |
UM0434 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $3,479 | $4,000 | Not Implemented |
UM0434 # 05 Y:2013 | 05 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,445 | $8,750 | Not Implemented |
UM0434 # 06 Y:2013 | 06 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $2,500 | Implemented |
UM0434 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,027 | $200 | Not Implemented |
UM0432 # 01 Y:2013 | 01 | 2013 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,000 | $10,000 | Implemented |
UM0432 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $8,484 | $15,000 | Not Implemented |
UM0432 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,532 | $200 | Implemented |
UM0432 # 04 Y:2013 | 04 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,790 | $2,500 | Implemented |
WV0468 # 01 Y:2013 | 01 | 2013 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $20,196 | $57,000 | Not Implemented |
WV0468 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,596 | $31,932 | Implemented |
WV0468 # 03 Y:2013 | 03 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,882 | $2,000 | Not Implemented |
WV0468 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,463 | $29,680 | Implemented |
WV0468 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,865 | $3,830 | Implemented |