IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0295 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $529 $3,076 Not Implemented
SF0295 # 06 Y:2004 06 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $23,382 $48,990 Not Implemented
SF0295 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $159 $250 Not Implemented
SF0295 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,996 $5,126 Implemented
SF0295 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,204 $4,525 Not Implemented
SF0295 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,565 $7,217 Implemented
SF0295 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,378 $0 Implemented
LE0198 # 01 Y:2004 01 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,168 $76,950 n/a
LE0198 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $2,500 Implemented
LE0198 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,443 $24,000 Implemented
LE0198 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $778 $200 Not Implemented
LE0198 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $566 Implemented
LE0189 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,542 $600 Implemented
LE0189 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,806 $1,193 Not Implemented
LE0189 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $145 $0 Not Implemented
LE0189 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $293 $0 Implemented
LE0189 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,301 $575 Not Implemented
LE0189 # 03 Y:2004 03 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,151 $6,000 Not Implemented
LE0189 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,147 $0 Not Implemented
SD0339 # 02 Y:2004 02 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,250 $2,570 Not Implemented
SD0339 # 03 Y:2004 03 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,831 $0 Implemented
SD0339 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $477 $1,700 Not Implemented
SD0339 # 05 Y:2004 05 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,362 $10,000 n/a
SD0339 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,112 $320 Implemented