Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23
matching recommendationsNAICS | 339112 | Surgical and Medical Instrument Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0166 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,135 | $4,045 | Not Implemented |
IC0166 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $757 | $136 | Not Implemented |
IC0166 # 04 Y:2009 | 04 | 2009 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $2,442 | $1,720 | Not Implemented |
IC0166 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $84 | $345 | Implemented |
IC0166 # 06 Y:2009 | 06 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $134 | $0 | Implemented |
IC0166 # 07 Y:2009 | 07 | 2009 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $3,264 | $16,200 | Not Implemented |
IC0166 # 08 Y:2009 | 08 | 2009 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $659 | $0 | Not Implemented |
IC0166 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,511 | $10,994 | Implemented |
MA0650 # 04 Y:2009 | 04 | 2009 | REDUCE VENTILATION AIR | $250 | $0 | Implemented |
MA0650 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $213 | $0 | Implemented |
MA0650 # 03 Y:2009 | 03 | 2009 | REDUCE VENTILATION AIR | $581 | $2,300 | Implemented |
MA0650 # 02 Y:2009 | 02 | 2009 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,735 | $0 | Implemented |
MA0650 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $5,218 | $10,000 | Not Implemented |
UF0419 # 01 Y:2009 | 01 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,890 | $904 | Not Implemented |
UF0419 # 02 Y:2009 | 02 | 2009 | INSTALL OCCUPANCY SENSORS | $2,358 | $0 | Not Implemented |
UF0419 # 03 Y:2009 | 03 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,291 | $0 | Not Implemented |
UF0419 # 04 Y:2009 | 04 | 2009 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $490 | $0 | Not Implemented |
UF0419 # 05 Y:2009 | 05 | 2009 | OPTIMIZE PLANT POWER FACTOR | $2,671 | $3,405 | Not Implemented |
UF0419 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $32,995 | $9,325 | Not Implemented |
UF0419 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $112,051 | $1,026 | Not Implemented |
UF0419 # 08 Y:2009 | 08 | 2009 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $107,292 | $42,500 | Not Implemented |
UF0419 # 09 Y:2009 | 09 | 2009 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $41,483 | $4,000 | Not Implemented |
UF0419 # 10 Y:2009 | 10 | 2009 | SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE | $2,671 | $3,405 | Not Implemented |