IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

307

matching recommendations
Reset
NAICS 339113 Surgical Appliance and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0241 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,593 $1,660 Implemented
MI0241 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $955 $80 Not Implemented
MI0241 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $686 $1,520 Implemented
MI0241 # 12 Y:2013 12 2013 INSTALL OCCUPANCY SENSORS $542 $209 Not Implemented
MI0233 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $246,388 $33,021 Implemented
MI0233 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $150,126 $80 Implemented
MI0233 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $44,157 $11,632 Not Implemented
MI0233 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,400 $1,660 Implemented
MI0233 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $10,216 $11,120 Not Implemented
MI0233 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,406 $1,060 Not Implemented
MI0233 # 07 Y:2012 07 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,508 $5,069 Not Implemented
MI0233 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,430 $2,665 Implemented
MI0233 # 09 Y:2012 09 2012 INSTALL OCCUPANCY SENSORS $5,193 $800 Implemented
MI0233 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,631 $2,050 Implemented
MI0233 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,084 $80 Implemented
MI0233 # 12 Y:2012 12 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,056 $843 Implemented
AM0617 # 01 Y:2012 01 2012 DEVELOP STANDARD OPERATING PROCEDURES $191,786 $6,200 Not Implemented
AM0617 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $153,000 $375,000 Not Implemented
AM0617 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,264 $2,775 Implemented
AM0617 # 04 Y:2012 04 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $2,146 $0 Implemented
AM0617 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,056 $1,562 Implemented
AM0617 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,871 $64 Implemented
AM0617 # 07 Y:2012 07 2012 RECYCLE WHITE WATER $1,161 $7,179 Implemented
AM0617 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $911 $5,377 Implemented
AM0617 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $300 Implemented