IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

323

matching recommendations
Reset
NAICS 339113 Surgical Appliance and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0140 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $1,545 Implemented
TT0140 # 03 Y:2014 03 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,428 $8,000 Not Implemented
TT0140 # 04 Y:2014 04 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,430 $4,000 Not Implemented
TT0140 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $25,238 $36,000 Implemented
TT0140 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $825 Not Implemented
TT0140 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,206 $125 Implemented
TT0140 # 08 Y:2014 08 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $3,333 $50 Implemented
TT0140 # 09 Y:2014 09 2014 DISCONNECT BALLASTS $358 $50 Implemented
MI0241 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $16,509 $3,900 Implemented
MI0241 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,217 $6,000 Implemented
MI0241 # 03 Y:2013 03 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,040 $80 Implemented
MI0241 # 04 Y:2013 04 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,960 $540 Implemented
MI0241 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,883 $4,691 Implemented
MI0241 # 06 Y:2013 06 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,564 $440 Implemented
MI0241 # 07 Y:2013 07 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,118 $5,397 Not Implemented
MI0241 # 08 Y:2013 08 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,942 $2,196 Implemented
MI0241 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,593 $1,660 Implemented
MI0241 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $955 $80 Not Implemented
MI0241 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $686 $1,520 Implemented
MI0241 # 12 Y:2013 12 2013 INSTALL OCCUPANCY SENSORS $542 $209 Not Implemented
MI0233 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $246,388 $33,021 Implemented
MI0233 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $150,126 $80 Implemented
MI0233 # 03 Y:2012 03 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $44,157 $11,632 Not Implemented
MI0233 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,400 $1,660 Implemented
MI0233 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $10,216 $11,120 Not Implemented