Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,403
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0042 # 06 Y:2025 | 06 | 2025 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $9,158 | $8,500 | n/a |
CC0042 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,083 | $8,883 | n/a |
CC0042 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $38,059 | $9,385 | n/a |
CC0042 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,575 | $187,740 | n/a |
CC0042 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $912 | $420 | n/a |
CC0042 # 03 Y:2025 | 03 | 2025 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,748 | $0 | n/a |
OR0805 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,157 | $3,706 | n/a |
OR0805 # 05 Y:2025 | 05 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $5,605 | $0 | n/a |
OR0805 # 01 Y:2025 | 01 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,892 | $0 | n/a |
OR0805 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $103,946 | $1,750,000 | n/a |
OR0805 # 03 Y:2025 | 03 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $928 | $0 | n/a |
OR0805 # 02 Y:2025 | 02 | 2025 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,187 | $0 | n/a |
SD0667 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,877 | $3,727 | n/a |
SD0667 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $260,930 | $10,784 | n/a |
SD0667 # 06 Y:2025 | 06 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $17,049 | $46,406 | n/a |
SD0667 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,797 | $0 | n/a |
SD0667 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $418,912 | $524,659 | n/a |
SD0667 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,190 | $8,318 | n/a |
SD0667 # 04 Y:2025 | 04 | 2025 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,121 | $299 | n/a |
WM0227 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,765 | $7,055 | n/a |
WM0227 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,869 | $2,450 | n/a |
WM0227 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $787 | $2,103 | n/a |
WM0227 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $727 | $0 | n/a |
OK1127 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,583 | $11,180 | n/a |
OK1127 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,612 | $4,557 | n/a |