IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0164 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $1,271 Implemented
IP0164 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,649 $1,428 Implemented
IP0164 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,709 $1,228 Implemented
IP0164 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $803 Implemented
IP0164 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $972 $1,279 Implemented
IP0139 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,551 $36 Implemented
IP0139 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $647 $1,350 Implemented
IP0139 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,001 $51,911 Implemented
IP0139 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,243 $0 Implemented
IP0064 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,082 $700 Implemented
IP0064 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $382 $888 Implemented
IP0064 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $893 $3,007 Implemented
IP0064 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $878 Implemented
IP0064 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,306 $250 Implemented
IP0064 # 01 Y:2016 01 2016 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $839 $0 Implemented
IP0064 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $5 Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
IP0040 # 02 Y:2015 02 2015 APPLY FOR INVESTMENT INCENTIVES $1,728 $0 Implemented
IP0040 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,452 $99 Implemented
IP0032 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,263 $0 Implemented
IP0032 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $659 $556 Implemented
IP0032 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $16,018 Implemented