Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1051 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $8,210 | $4,500 | Not Implemented |
OK1051 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,640 | $7,393 | Implemented |
OK1051 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,614 | $677 | Implemented |
OK1051 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,449 | $0 | Not Implemented |
OK1050 # 03 Y:2021 | 03 | 2021 | OPTIMIZE PLANT POWER FACTOR | $2,379 | $1,973 | Not Implemented |
OK1050 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,760 | $900 | Implemented |
OK1050 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,327 | $0 | Not Implemented |
OK1008 # 02 Y:2019 | 02 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,601 | $16,747 | Not Implemented |
OK1008 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $108,355 | $105,560 | Not Implemented |
OK1008 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $107,652 | $264,795 | Implemented |
OK1008 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $29,328 | $2,128 | Implemented |
OK1008 # 05 Y:2019 | 05 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $19,941 | $2,337 | Not Implemented |
OK1008 # 06 Y:2019 | 06 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,069 | $0 | Implemented |
OK1008 # 07 Y:2019 | 07 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,690 | $0 | Not Implemented |
OK1008 # 08 Y:2019 | 08 | 2019 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,146 | $1,788 | Not Implemented |
OK0793 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $67,527 | $42,259 | Not Implemented |
OK0793 # 11 Y:2010 | 11 | 2010 | INSULATE BARE EQUIPMENT | $21,881 | $4,522 | Not Implemented |
OK0793 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $88,705 | $104,400 | Implemented |
OK0793 # 09 Y:2010 | 09 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,136 | $21,130 | Not Implemented |
OK0793 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,971 | $111,113 | Not Implemented |
OK0793 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,411 | $69,755 | Not Implemented |
OK0793 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $8,717 | $17,813 | Implemented |
OK0793 # 05 Y:2010 | 05 | 2010 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $104,850 | $134,480 | Not Implemented |
OK0793 # 04 Y:2010 | 04 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $217,752 | $100,000 | Not Implemented |
OK0793 # 03 Y:2010 | 03 | 2010 | INSTALL REPLACEMENT DOORS | $1,246 | $33,150 | Not Implemented |