IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,391

matching recommendations
Reset
NAICS 3399 Other Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0581 # 11 Y:2005 11 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,467 $8,300 Implemented
MA0581 # 12 Y:2005 12 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,134 $6,429 Not Implemented
BD0281 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,944 $7,408 Not Implemented
BD0281 # 02 Y:2005 02 2005 USE RADIANT HEATER FOR SPOT HEATING $7,491 $6,000 Not Implemented
BD0281 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,406 $0 Not Implemented
BD0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,725 $200 Not Implemented
BD0281 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,418 $675 Not Implemented
BD0281 # 06 Y:2005 06 2005 SHUT OFF PILOTS IN STANDBY EQUIPMENT $964 $0 Not Implemented
BD0281 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $631 $450 Not Implemented
BD0281 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $516 $300 Not Implemented
BD0281 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $903 $1,320 Not Implemented
BD0282 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $14,504 $9,200 Not Implemented
BD0282 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,913 $12,000 Not Implemented
BD0282 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,962 $3,545 Not Implemented
BD0282 # 04 Y:2005 04 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $6,896 $15,000 Not Implemented
BD0282 # 05 Y:2005 05 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $6,787 $5,000 Not Implemented
BD0282 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,439 $3,200 Not Implemented
BD0282 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,696 $375 Not Implemented
BD0282 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,494 $3,200 Not Implemented
BD0282 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $544 $0 Not Implemented
BD0282 # 10 Y:2005 10 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $212 $450 Not Implemented
UU0073 # 01 Y:2004 01 2004 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,250 $8,000 Not Implemented
UU0073 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,080 $860 Not Implemented
UU0073 # 03 Y:2004 03 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $990 $6,000 Not Implemented
UU0073 # 04 Y:2004 04 2004 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,434 $0 Not Implemented