Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
88
matching recommendationsNAICS | 3399 | Other Miscellaneous Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1914 # 07 Y:2019 | 07 | 2019 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $150 | $0 | n/a |
UK1914 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,233 | $8,100 | n/a |
UK1914 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,556 | $21,155 | n/a |
UK1914 # 10 Y:2019 | 10 | 2019 | OPTIMIZE PLANT POWER FACTOR | $14,446 | $12,425 | n/a |
UK1914 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $394 | $0 | n/a |
UK1914 # 08 Y:2019 | 08 | 2019 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $145 | $80 | n/a |
UK1914 # 02 Y:2019 | 02 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,217 | $1,100 | n/a |
UK1914 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $642 | $2,510 | n/a |
UK1914 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,187 | $0 | n/a |
UK1914 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,746 | $1,370 | n/a |
UF0537 # 08 Y:2019 | 08 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $4,046 | $6,800 | Not Implemented |
UF0537 # 07 Y:2019 | 07 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $4,046 | $914 | Implemented |
UF0537 # 06 Y:2019 | 06 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,428 | $500 | Implemented |
UF0537 # 05 Y:2019 | 05 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,091 | $8,377 | Implemented |
UF0537 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $9,846 | $1,101 | Not Implemented |
UF0537 # 03 Y:2019 | 03 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $14,734 | $25,470 | Not Implemented |
UF0537 # 09 Y:2019 | 09 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $37,600 | $100,000 | Implemented |
UF0537 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,122 | $61,119 | Not Implemented |
UF0537 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $55,866 | $333,760 | Not Implemented |
UF0537 # 10 Y:2019 | 10 | 2019 | RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE | $40,781 | $21,000 | Not Implemented |
LE0481 # 06 Y:2019 | 06 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $842 | $3,200 | Not Implemented |
LE0481 # 05 Y:2019 | 05 | 2019 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $50,429 | $162,000 | Implemented |
LE0481 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,547 | $11,688 | Implemented |
LE0481 # 03 Y:2019 | 03 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $42,460 | $57,500 | Not Implemented |
LE0481 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,057 | $40 | Implemented |